Xi 'an high precision hydraulic technolgy co., ltd. 

hotline:

029-8889-3252

液压升降柱
Your current location : Home >> News >> Market

Do you know the proper steps for mounting the elevator

2020-08-25
second

Do you know the proper steps for mounting the elevator? In the future smart city planning, the elevator column will play an important role in the parking lot and entrance and exit system. It has stronger vehicle control ability than the gate, perfect concealment, neat and beautiful, and will not occupy the ground space. The level of collision prevention can reach 80 tons, truly protect people's lives and property safety, and bring us a safer living environment.

Elevator column principle: when the car hits the elevator column, the column block the car's advance. The ground panel and limit flange serve as the fulcrum of force. For fragile materials such as cast aluminum and cast iron, the fulcrum cannot be made, and must be directly exposed on the embedded base to transfer the strength to the buried foundation and form a solid support. The anti-collision flange must be in direct contact with the embedded flange to form piston motion, which directly transfers the force to the embedded and embedded foundation to release energy. So when you do the lifting column installation. What are the steps

Step 1: Dig the foundation pit

Width of foundation pit: 500mm

Foundation pit depth: 1200mm

Step 2: Lay the base level at the bottom

Brick the bottom of the foundation pit. Lifting column is also called lifting ground column, lifting road pile, anti-collision road pile, hydraulic lifting column, isolation pile, etc. The lifting column is widely used in many occasions such as urban traffic, the gates of the army and important state organs and surrounding areas, walking streets, expressway tollbooths, airports, schools, Banks, large clubs, parking lots and so on. Through the restriction of passing vehicles, the traffic order and the safety of major facilities and places are effectively guaranteed.

The thickness of masonry layer is 200mm

Step 3:

Lay drainage channels

Bricks were used to make drains on pre-laid gravel.

Width of drain: 100mm

Height: 100 mm

Lay drainage channels

In accordance with the number of elevating columns, a layer is built above the drain to cover the drain so as to avoid filling the drain with cement.

Step 4: Place the lifting column

After the drainage channel is completed, put the elevating column in turn according to the plan, adjust the horizontal Angle, to ensure that the elevating column is flush with the road.

Step 5: Fixed equipment

After making sure the equipment is level with the ground, fill in a small amount of cement to fix the equipment.

Step 6: Wiring the equipment

The TV cable USES RVV3*2.5 wire, and the LED warning light USES 4*1.5 wire. Plug in PVC pipe to the control box.

Step 7: Wiring the control box

According to the control box connection method shown in the figure, the motor wires shall be connected to the positive and negative lines of the motor and the LED light group of the common line respectively.

Step 8: Debug

After the control box is connected, conduct a power test to ensure that the rise and fall are normal and the rise and fall are consistent with the direction of the remote control.

Step 9: Backfill the rammed earth

After the equipment is adjusted correctly, fill in the sand and compacted, leaving a distance of 200mm between the equipment and the ground. Lifting column is also called lifting ground column, lifting road pile, anti-collision road pile, hydraulic lifting column, isolation pile, etc. The lifting column is widely used in many occasions such as urban traffic, the gates of the army and important state organs and surrounding areas, walking streets, expressway tollbooths, airports, schools, Banks, large clubs, parking lots and so on. Through the restriction of passing vehicles, the traffic order and the safety of major facilities and places are effectively guaranteed.

Step 10: Smooth the ground

Make sure the elevating column is parallel to the ground so that cement can be poured on the rammed soil, flush with the ground, and the road can be restored.


Label

Recent:

global service hotline

029-8889-3252

tel:18629489905

email:hpryyjs@163.com

web:www.xahph.com

add:Room30707,building1,WestDistrict,Lagerstroemiaindica,eastofTaibaiSouthRoad,YantaDistrict,Xi'anCity

site:TaoGuanzhaiVillage,HuYiDistrict,Xi'an(IndustrialPark)

1597366411136092.png

QR code

Copyright © Xi'an high precision hydraulic technolgy co., ltd All rights reserved: 陕ICP备2020013343号 Specializing in Hydraulic lifting column, proportional servo valve, electro-hydraulic system ,Welcome to inquire! support: 祥云平台