Notes for installation of hydraulic lifting column

1. Digging foundation pits: Dig foundation pits according to the overall dimensions of the product. Size: length: Determine the dimensions according to the road conditions on site; Width: 600-800 mm; Depth: 1400mm(including a seepage layer of 300mm).

2. Make a seepage layer: make a 300mm seepage layer from the bottom of the foundation pit after mixing with sand and gravel. The seepage layer shall be paved and tamped to prevent the equipment from sinking. (If possible, choose gravel below 10mm instead of sand.) According to the different conditions of the region to choose whether to do drainage.

3. Remove the outer barrel for leveling: remove the outer barrel with hexagon socket and put it on the seepage layer. Adjust the levelness of the outer barrel, make the upper surface of the outer barrel slightly higher than the ground plane for 3-5mm, and weld reinforcement with reinforcement around the outer barrel to prevent inclination.

4. Embedded threading pipe: Embedded threading pipe according to the position of outlet hole reserved on the surface of the outer barrel. The diameter of the threading pipe shall be determined according to the number of lifting columns. Generally, each lifting column shall require one cable of 3*1.5 power line and one control line of 2*0.75 pressure relief solenoid valve. If there is a lamp belt, and one more cable of 2*0.5 power line, the specific use shall be determined before construction according to the needs of customers and the difference of distribution.

5. Debugging: put the circuit on the equipment, operate the rising and falling, observe the rising and falling of the equipment, adjust the rising height of the equipment, and check whether the equipment has oil leakage.

6. Fixed equipment and poured: Put the equipment into the pit, backfill the appropriate amount of sand, fix the equipment with stones, and then pour the equipment with C40 concrete slowly and evenly until it is level with the upper surface of the equipment.

Notes for use of hydraulic lifting column

1. The remote control controls the rise and fall of the cylinder body :(it can be installed according to different needs of customers) there are three buttons on the remote control, namely, rise, fall and stop. The remote control can be used to make the device rise and fall. The stop key can be used to stop the action of the device before the action is completed.

2. Distribution box buttons control the rise and fall of the cylinder body: the surface of the box body is equipped with buttons for rise, fall and stop. Use this button can make the equipment up and down, wuwei lifting column, during the action did not complete action to implement equipment can use the stop button to stop 3, external button box control cylinder lifting: use this button can make the equipment up and down, during the action did not complete action to implement equipment can use the stop button to stop. When the equipment is in the rising state and the power grid is cut off, the distribution box control system cannot be started normally due to the power cut off. The distribution box is equipped with 12V lead-acid battery, in order not to affect the normal traffic of vehicles, usually press the pressure relief combination button -- the drop button and the stop button on the box at the same time. If the cylinder does not move or slide down for a period of time, the downward pressure can be artificially exerted until the cylinder drops to the ground level.

Daily precautions for hydraulic lifting column

(1) Avoid frequent lifting within a short time, otherwise the motor will be heated and damaged.

(2) Pay attention to pedestrians during ascending operation to avoid injury.

(3) When the cylinder is not working normally, press the stop button once after the rise and fall, so as to avoid the damage of electrical components and the failure to stop, which will cause the motor to burn out.

(4) In the process of use, if it is found that individual lifting column is much higher than other columns, should immediately press the stop button, and observe whether the motor is still working, when the motor has been confirmed to stop, timely contact with the factory.

(5) It is strictly prohibited to fill the gap around the column with silt and debris, so as not to affect the normal lifting of the column.

(6) It is strictly prohibited to carve on the surface of the column. Automatic lifting column will cause damage to the column.


Label

Recent:

global service hotline

029-8889-3252

tel:18629489905

email:hpryyjs@163.com

web:www.xahph.com

add:Room30707,building1,WestDistrict,Lagerstroemiaindica,eastofTaibaiSouthRoad,YantaDistrict,Xi'anCity

site:TaoGuanzhaiVillage,HuYiDistrict,Xi'an(IndustrialPark)

1597366411136092.png

QR code

Copyright © Xi'an high precision hydraulic technolgy co., ltd All rights reserved: 陕ICP备2020013343号 Specializing in Hydraulic lifting column, proportional servo valve, electro-hydraulic system ,Welcome to inquire! support: 祥云平台